- having a worker with sufficient engineering % or
- docking at a station with a high enough technology certificate, preferably by paying to do so
If this would be complicated, even in its most basic form (after list above), maybe I'll think of something else in the future I'd consider making, which would also be something I suspect was possible to do < 4 hrs.
As the email notification doesn't seem to work, if I take a long time to reply and one would like a quick reply, I could reach through my discord account DynV#6231 or emailing dynvec@gmail.com